{"id":5560,"date":"2025-09-25T09:59:59","date_gmt":"2025-09-25T08:59:59","guid":{"rendered":"https:\/\/www.bcta.group\/attma\/?p=5560"},"modified":"2025-09-23T10:15:10","modified_gmt":"2025-09-23T09:15:10","slug":"dimensional-evidence-for-envelope-area-calculations","status":"publish","type":"post","link":"https:\/\/www.bcta.group\/attma\/2025\/dimensional-evidence-for-envelope-area-calculations\/","title":{"rendered":"Dimensional Evidence for Envelope Area Calculations"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">There is a minimum amount of dimensional evidence that is required for air tightness testers to gather and from several hundred audits it\u2019s clear that a good proportion of testers are unclear on what is required.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Where do the requirements come from?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The source of the requirements for dimensional evidence come from the National Occupational Standards and these documents outline minimum knowledge and understanding that are required to demonstrate competence.&nbsp; The competent person schemes use these documents to assess whether their members have the minimum knowledge and are competent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The specific National Occupational Standard that deals with the calculation of building envelope is ASTATT6.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What are the requirements for dimensional evidence?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">While ASTATT6 cover several aspects of the calculation of building envelopes there are some specific sections that deal with dimensional evidence, which are:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">P1 obtain accurate dimensions from drawings and any other existing data relevant to the standard(s) being tested to<\/p>\n<\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">P3 take on-site measurements to confirm or supplement information already available as necessary<\/p>\n<\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">P4 sketch plans and sections where none have been provided with sufficient dimensions to enable the building envelope to be accurately calculated<\/p>\n<\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">P5 amend plans and sections provided where they do not correctly represent the built building<\/p>\n<\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">P13 keep calculations and supporting information including drawings, sketches, photographs, site measurements and observations in order to show how area values were obtained. \u00a0<\/p>\n<\/blockquote>\n\n\n\n<h3 class=\"wp-block-heading\">What does this mean?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">ASTATT6 therefore states an order of acquiring, checking and supplementing dimensional evidence as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Acquire plan and section drawings.<\/li>\n\n\n\n<li>Confirm that the dimensions on the plan and section drawings are accurate by doing a check of the dimensions on site.<\/li>\n\n\n\n<li>Take measurements for dimensions that are not included in the plan and section drawings and amend these documents with the missing dimensions.<\/li>\n\n\n\n<li>If any of the floor plan or section drawings are missing, then you need to make your own sketches of these from the measured dimensions.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Why are plan and section drawings important if I measure dimensions on-site?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In terms of the building envelope calculation, you don\u2019t need plan and section drawings as you can sketch your own and add dimensions to them from your on site measurements.&nbsp; This does mean that less time is spent on-site testing as more time is spent to complete the building envelope calculations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Additionally, it is better to know the shape, size and complexity of the building before attending site so that:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>You have sufficient time to undertake the building envelope calculation when the building is significantly more complex then normal, with elements such as:<ul><li>Vaulted ceilings<\/li><\/ul><ul><li>Complex roof intersections<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Split floor levels<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>You know how large the building is and can therefore determine whether your fan has enough flow to be able to reach 50Pa, assuming it\u2019s going to pass.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>There is a minimum amount of dimensional evidence that is required for air tightness testers to gather and from several<\/p>\n","protected":false},"author":12,"featured_media":5562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[],"class_list":["post-5560","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"publishpress_future_action":{"enabled":false,"date":"2026-06-17 09:21:57","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/posts\/5560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/comments?post=5560"}],"version-history":[{"count":2,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/posts\/5560\/revisions"}],"predecessor-version":[{"id":5629,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/posts\/5560\/revisions\/5629"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/media\/5562"}],"wp:attachment":[{"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/media?parent=5560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/categories?post=5560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bcta.group\/attma\/wp-json\/wp\/v2\/tags?post=5560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}