{"id":44051,"date":"2021-04-08T13:45:22","date_gmt":"2021-04-08T12:45:22","guid":{"rendered":"https:\/\/www.bcta.group\/tbph\/?post_type=product&#038;p=44051"},"modified":"2025-10-08T10:57:33","modified_gmt":"2025-10-08T09:57:33","slug":"attma-air-testing-inter-lab-testing","status":"publish","type":"product","link":"https:\/\/www.bcta.group\/tbph\/product\/attma-air-testing-inter-lab-testing\/","title":{"rendered":"ATTMA Air Testing Inter-Lab Testing"},"content":{"rendered":"<h3>What is ATTMA Air Testing Inter-Lab Testing?<\/h3>\n<p>Inter-laboratory testing is a structured process where multiple companies conduct air tightness tests on the same building using their own equipment and methods. This allows for performance benchmarking, quality assurance, and industry-wide data comparison.<br \/>\nParticipation is mandatory for UKAS-accredited companies holding ISO 17025, but the testing is also open to non-accredited testers who want to assess their performance and contribute to the study.<\/p>\n<h3>Testing Setup and Requirements<\/h3>\n<p>Testing will take place at <a href=\"http:\/\/www.bcta.group\/tbph\">The Building Performance Hub<\/a> House, which has a surface area of approximately 230m\u00b2. This can be tested using a single fan (such as the TEC Minifan) or two Pulse tanks. Each tester will have a 45-minute window for setup, testing, and takedown. A cloth frame must be used for door installation.<\/p>\n<h3>Independent Reporting<\/h3>\n<p>ATTMA will produce an anonymised final report, available only to participating companies. Each company will be assigned a letter (e.g. Company A, Company B) for comparison. Reports will be distributed via email.<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"http:\/\/www.attma.org\">ATTMA<\/a> is pleased to collaborate with The Building Performance Hub for the ATTMA Air Testing Inter-Laboratory Testing programme.\u00a0This initiative is open to both UKAS-accredited and non-UKAS-accredited air tightness testing companies.<\/p>\n<h3>Participation Fee<\/h3>\n<p>The cost to take part in the ATTMA Air Testing Inter-Laboratory Testing is \u00a3160 + VAT per tester\/company, payable directly to The Building Performance Hub. This fee cannot be processed through your ATTMA account.<\/p>\n<h3>Register Your Interest<\/h3>\n<p>If demand exceeds expectations, additional testing dates will be made available. For more information or to register, please contact Chris Milsom.<\/p>\n","protected":false},"featured_media":47703,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_eb_attr":""},"product_brand":[],"product_cat":[18],"product_tag":[],"class_list":{"0":"post-44051","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-air-tightness","8":"first","9":"instock","10":"taxable","11":"shipping-taxable","12":"purchasable","13":"product-type-variable"},"_links":{"self":[{"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/product\/44051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/comments?post=44051"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/media\/47703"}],"wp:attachment":[{"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/media?parent=44051"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/product_brand?post=44051"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/product_cat?post=44051"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/www.bcta.group\/tbph\/wp-json\/wp\/v2\/product_tag?post=44051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}