This banner reel contains paid advertising

Speaker & Tapping Machine Requirements – Important

Following the Sound Insulation Testing & Measurement Association’s grant of Accreditation, SITMA members are required to conduct some addition checks on their speakers and tapping machines. These must happen within the time periods shown below. 

The Lodgement Portal will not allow testing to be conducted on the dates below if the evidence has not been issued to SITMA. 

Speaker Checks – Stability

Must be completed before 31st May 2024

Stability testing your speaker is simple and can be conducted yourself by following the instructions using the button below:

Speaker Checks – Directivity

Must be completed before 30th June 2024

Directivity testing can be conducted at most calibration laboratories
Directivity testing your speaker can be conducted yourself by following the instructions using the button below:

Tapping Machine “One Off” Checks

Must be completed before 30th June 2024

Tapping Machine Checks can be conducted at most calibration laboratories
Tapping Machine Checks can be conducted by yourself by following the instruction using the button below:

Facebook
LinkedIn
Email